A die or mould is only as good as the parts it makes. Hailong plans quality from the first design review through tryout and delivery, and checks materials and processes at every stage.
Certified management systems
- IATF 16949 automotive quality management system
- ISO 9001 quality management system
- ISO 14001 environmental management system
- ISO 45001 occupational health and safety management system
Quality management planning
After the quotation and contract, each project gets a quality management plan that covers four processes:
- Mold design
- Process programming
- Processing and assembly
- Mold test and delivery
Inspection at every stage
- Incoming inspection of raw materials
- In-process inspection during machining and assembly
- Product monitoring during tryout
- Control of nonconforming products
- Controlled records and documents for production planning and production flow
Measuring and testing equipment
- Large laser three-coordinate measuring machine (CMM)
- Blue-light 3D scanner and handheld 3D scanning with CAD comparison
- Spectrum analyzer and microcomputer carbon-sulfur analyzer
- Universal material testing machine
- Metallographic analyzer and hardness testers
- Large mold tryout press
Tryout before delivery
Mold testing is a fixed step in every project. Dies are tried out on our press, parts are measured, and the results are shared with you before the die ships. For stamped parts we also build checking fixtures.
Start your project
Send your part drawings or 3D data using our RFQ guide or the contact page. You can also email nora@qdhailong.com or call +86-532-66090318.
